Our Process

BCI Flex-Patch Completed

Below is a description of the Flex-Patch process.


Step 1

Fahrner crews clean and dry the area using air compressors with a minimum of 100 psi and heat lances with a minimum temperature of 2200 degrees. Sealant will not adhere to dirty or wet surfaces.

Step 2

FLEX-PATCH is applied through a wand and then hand squeegeed to insure proper coverage. A sufficient amount of sealant is applied to flood the entire distressed area and provide an 1/8″ base to hold the final cover material.

Step 3

A fine aggregate cover material is applied over the sealant when addressing cupped joints in asphalt pavement. The cover material has the added benefit of improving the ride of the surface.