Area to be repaired.

Infrared heating unit is lowered to within 6" of the pavement.

Having heated the area to be repaired, the softened asphalt is raked and cleared of impurities.

New asphalt is stored at 300° and added to the repair area.

New and original asphalt is blended and raked level.

The edges are first rolled to bond the new asphalt with the original asphalt. The entire area is then compacted with a vibratory roller.

The repair becomes a seamless part of the original asphalt.
Patch is completed in approximately 15 minutes.