Chip Seal
step1a step1b step2a

 

Roads are prepared prior to sealing with a combination of crack filling, patching and sweeping. Wedging and thin overlays can also be installed where required.

 

 

Manholes and utilities are covered with dry aggregate prior to applying oil. After the chips are spread, the aggregate is easily removed from the covers using small hand tools.

 

 

A variety of oil types are available for application.

 
step2b step3a step3b

 

Oil is applied at a computer assisted rate and at varying widths up to 24’ wide in a single pass.

 

 

A variety of cover material is available for application.

 

 

Aggregate is uniformly spread at the desired rate, up to 24’ wide in a single pass.

 
step4

 

Compaction is completed with pneumatic tired and/or steel wheeled rollers.

 