Roads are prepared prior to sealing with a combination of crack filling, patching and sweeping. Wedging and thin overlays can also be installed where required. |
|
Manholes and utilities are covered with dry aggregate prior to applying oil. After the chips are spread, the aggregate is easily removed from the covers using small hand tools. |
|
A variety of oil types are available for application. |
|||
![]() |
![]() |
![]() |
||||||
|
Oil is applied at a computer assisted rate and at varying widths up to 24’ wide in a single pass. |
|
A variety of cover material is available for application. |
|
Aggregate is uniformly spread at the desired rate, up to 24’ wide in a single pass. |
|||
![]() |
||
|
Compaction is completed with pneumatic tired and/or steel wheeled rollers. |
|